SteveSS
Well-Known Member
- Local time
- 6:40 AM
- Joined
- May 28, 2013
- Messages
- 5,244
- Reaction score
- 8,166
- Location
- Colorado Springs
I don't know about the offshore rigs but the rest I do.
That first guy covered in drilling mud is setting the tongs. Usually, it's a two-man job but it is that dirty and you have to move that fast and know how to throw your whole weight into it.
Next, that guy is what we call throwing the chain. If you mess it up it will take off your hand.
That guy pulling the pipe toward him is the Derrick hand. He's standing on a 3-foot platform 35-65 feet in the air off the drilling platform. Sometimes they do fall.
When you see the tongs lifting the pipe up they're taking the pipe out of the hole called a bit trip. If we're 5000 feet in the hole they have to the lifting unthreading and lifting the pipe every 30 feet. That's 167 times out and 167 times back in. Nonstop. That's when I, the geologist, would get some sleep.
That guy pushing the pipe is putting it in the rat hole. He's pushing 30-60 feet of pipe hanging over his head. There are tons of steel hanging above their heads. I once saw a cable break and it all came crashing down. No one got hurt.
The oily one is they're breaking a connection full of oil. That means money!
Guys don't have to climb the chain to the top of the derrick. Usually, they put one foot in the chain hook and are lifted up.
One grueling job they have is if the hole starts to leak they have to carry 35-pound sacks of cotton seed hulls up 30 feet up a vertical ladder to the platform sometimes for 8 hours straight. I felt bad for them so I would help.
I think a new roughneck made $16/hour. Drilling is nonstop. We once quit when it dropped to more than 25 below zero and we couldn't keep the drilling mud from freezing.
If you want to be a roughneck and you have questions I can probably answer them.
Steve the oilfield geologist.
Last edited: