YY1
Well-Known Member
Did hurricane prep on the roof.
Closely examined the skylights and added some nails to some shigles on the vent ridge.
Yay.
Next up- testing the generator.
Maybe this year I'll actually finish wiring up the backfeed cord, and testing that.
...oh, and installed a VHF radio repeater and antenna at work.
Got done just in time for the dark clouds to form.
Didn't rain, though.
Scavenged the mount from an abandoned Dish Network dish.
Perfetly cleared the "Mansard" roof profile.
That is a modular building and the walls are an odd composite of masonry, a plasticy layer and plywood.
Closely examined the skylights and added some nails to some shigles on the vent ridge.
Yay.
Next up- testing the generator.
Maybe this year I'll actually finish wiring up the backfeed cord, and testing that.
...oh, and installed a VHF radio repeater and antenna at work.
Got done just in time for the dark clouds to form.
Didn't rain, though.
Scavenged the mount from an abandoned Dish Network dish.
Perfetly cleared the "Mansard" roof profile.
That is a modular building and the walls are an odd composite of masonry, a plasticy layer and plywood.