- Local time
- 4:58 PM
- Joined
- May 14, 2011
- Messages
- 18,322
- Reaction score
- 35,949
- Location
- On the Ridge, TN
But first - a slight aside, if I may:
I got under Fred the other evening to do the annual "adjust the clutch" thing...
Despite reading the FSM, I pretty much "common sense" it by making the wife work the pedal while I'm under there;
I witness the throwout bearing clearing the clutch fingers while she does this and guesstimate the spacing betwixt
(I don't have any sort of a feeler gauge that dang long...).
Satisfied there hasn't been any appreciable wear on the clutch and that it's right in the middle of pedal travel, where
I like it, I did a rudimentary check of neighboring things under there, witnessed all the oil drips and such - and made
my way back out of there, slowly.
Turned out, real slowly - as in "I can't do this much longer" slowly - and boy, did the concrete make me ache all over!
Fellas, I've reached that point, like I've written about before....
Anyways, I got out a tape measure and did some rudimentary measuring of my little garage vs. height of Fred and
came up with at best, about 5 feet clear as a maximum possible with the use of a lift.
So...
The question begs - is 5 feet clear worth the $$$ and work required to install a lift?
Does anyone reading this have a similar situation now? Was it worth it for you?
I got under Fred the other evening to do the annual "adjust the clutch" thing...
Despite reading the FSM, I pretty much "common sense" it by making the wife work the pedal while I'm under there;
I witness the throwout bearing clearing the clutch fingers while she does this and guesstimate the spacing betwixt
(I don't have any sort of a feeler gauge that dang long...).
Satisfied there hasn't been any appreciable wear on the clutch and that it's right in the middle of pedal travel, where
I like it, I did a rudimentary check of neighboring things under there, witnessed all the oil drips and such - and made
my way back out of there, slowly.
Turned out, real slowly - as in "I can't do this much longer" slowly - and boy, did the concrete make me ache all over!
Fellas, I've reached that point, like I've written about before....
Anyways, I got out a tape measure and did some rudimentary measuring of my little garage vs. height of Fred and
came up with at best, about 5 feet clear as a maximum possible with the use of a lift.
So...
The question begs - is 5 feet clear worth the $$$ and work required to install a lift?
Does anyone reading this have a similar situation now? Was it worth it for you?