Last day of the month . . . and the results of my "goal" . . . How'd it go ? ? ?
Finally, the last day of the month has arrived and the results of my "goal" . . .
This is a mock up of the first truss for the silo . . . turned out pretty much like designed . . .
Now - to get to the front wall and completion - got the left door covered with siding and ready to be installed.
Now the door has the siding painted and the window re-installed . . . along with the right side door getting framed
and ready for the siding to be installed . . .
Next - got the last garage door installed - so the entire downstairs is now closed up . . .
Next - I pulled down 1 of the plywood panels on the side of the building . . . and found a large number of these
"stink bugs" camped out under the plywood ( and this was a very small amount ) there was TONS of them
So I started down the wall and figured that the top panels needed to be removed and the stink bugs removed
as quickly as possible so the don't get all over the shop . . .
Removing more of the plywood sheathing . . . a goal that I've been waiting for - for a long time !
Removed all of the top panels and all the stink bugs too . . . and the shop is getting connected . . .
Pulling the panels down as I can . . . and turning these 2 shops into 1 big shop ! ! ! I'm excited ! ! !
So the results of goal . . .
Note: this was all done yesterday but the website only allows 10 pics posted.
My take on this - even thought the (2) doors on the front still need some design work ( and how they will open )
And the (2) windows above the doors in the rear of the shop still need to be ordered and installed . . .
Will take this as a WIN . . .
and meeting the goal to have the shop enclosed by the end of the month !!
More Later . . .
Finally, the last day of the month has arrived and the results of my "goal" . . .
This is a mock up of the first truss for the silo . . . turned out pretty much like designed . . .
Now - to get to the front wall and completion - got the left door covered with siding and ready to be installed.
Now the door has the siding painted and the window re-installed . . . along with the right side door getting framed
and ready for the siding to be installed . . .
Next - got the last garage door installed - so the entire downstairs is now closed up . . .
Next - I pulled down 1 of the plywood panels on the side of the building . . . and found a large number of these
"stink bugs" camped out under the plywood ( and this was a very small amount ) there was TONS of them
So I started down the wall and figured that the top panels needed to be removed and the stink bugs removed
as quickly as possible so the don't get all over the shop . . .
Removing more of the plywood sheathing . . . a goal that I've been waiting for - for a long time !
Removed all of the top panels and all the stink bugs too . . . and the shop is getting connected . . .
Pulling the panels down as I can . . . and turning these 2 shops into 1 big shop ! ! ! I'm excited ! ! !
So the results of goal . . .
Note: this was all done yesterday but the website only allows 10 pics posted.
My take on this - even thought the (2) doors on the front still need some design work ( and how they will open )
And the (2) windows above the doors in the rear of the shop still need to be ordered and installed . . .
Will take this as a WIN . . .
and meeting the goal to have the shop enclosed by the end of the month !!
More Later . . .