Finally time to pull the trigger . . . starting on the New (much anticipated) SHOP - Build

Last day of the month . . . and the results of my "goal" . . . How'd it go ? ? ?

Finally, the last day of the month has arrived and the results of my "goal" . . .

This is a mock up of the first truss for the silo . . . turned out pretty much like designed . . .

sm_shop1567.jpg


Now - to get to the front wall and completion - got the left door covered with siding and ready to be installed.

sm_shop1568.jpg


Now the door has the siding painted and the window re-installed . . . along with the right side door getting framed
and ready for the siding to be installed . . .

sm_shop1569.jpg


Next - got the last garage door installed - so the entire downstairs is now closed up . . .

sm_shop1570.jpg


Next - I pulled down 1 of the plywood panels on the side of the building . . . and found a large number of these
"stink bugs" camped out under the plywood ( and this was a very small amount ) there was TONS of them

sm_shop1571.jpg


So I started down the wall and figured that the top panels needed to be removed and the stink bugs removed
as quickly as possible so the don't get all over the shop . . .

sm_shop1572.jpg


Removing more of the plywood sheathing . . . a goal that I've been waiting for - for a long time !

sm_shop1573.jpg


Removed all of the top panels and all the stink bugs too . . . and the shop is getting connected . . .

sm_shop1574.jpg


Pulling the panels down as I can . . . and turning these 2 shops into 1 big shop ! ! ! I'm excited ! ! !

sm_shop1575.jpg


So the results of goal . . .

Note: this was all done yesterday but the website only allows 10 pics posted.

My take on this - even thought the (2) doors on the front still need some design work ( and how they will open )
And the (2) windows above the doors in the rear of the shop still need to be ordered and installed . . .

Will take this as a WIN . . .

and meeting the goal to have the shop enclosed by the end of the month !!

More Later . . .
 
Little re-cap on this project . . . a view back in time . . .

Looking back on this . . . it was quite interesting . . .

April 2021 . . . starting the build . . .

1727826689400.png


September 2021 . . . concrete pad is poured . . . ( 6 months to figure out how to get the concrete pad done )

1727826759693.png


October 2021 . . . wall framing of the left building is done . . . starting on the roof . . .

1727826923655.png


November 2021 . . . roof trusses and purlins are all in place . . .

1727827052325.png


December 2021 . . . start on the metal roofing . . . ( * first time I've ever done this * )

1727827176912.png


December 2021 . . . metal roof in installed . . .

1727827223664.png


December 2021 . . . siding on this part of the shop is completed . . . ( 3 months to get the building built )

1727827321767.png


AND - the start of a New Year . . . and "wrapping up" ( literally - with tarps ) the first part of this build . . .

January 1st 2022 . . . the temporary plywood and tarps get installed ( that I'm currently taking down . . . )

( 9 months from the first dig - to the completed building . . . )

1727827386500.png


January 2022 . . . got another building in the way that needs to get moved . . . the red shop to the right . . .

1727827470889.png


March 2022 . . . start building the foundation for where the building needs to get moved . . .

1727827575093.png


Pretty cool to look back at this . . . and remember putting that plywood up on New Years Day . . . and now the
plywood is being taken down to combine the (2) shops and make it into a single shop . . .

Come a long way on this build . . . THANKS to all of you and your comments to help keep me moving forward on
this project . . . It has been one hell of an adventure, learning new stuff and trying to figure out how to fix all of
the things that were botched up along the way - on top of trying to figure out HOW to get some of these things
by myself . . .

Life gets in the way, (2) granddaughters . . . loss of a job . . . covid . . . and all the other wonderful things that
life has a habit of throwing at us when we least expect it ( and least NEED it ) . . .

Seeing the final results - the shop being combined together is so rewarding . . . still got a bunch of stuff left to do,
and I sure hope that you all continue to follow me along during this endeavor . . .

Still got some pretty interesting "ideas" for the silo . . . that still needs to be designed, built, and installed ! !

Thanks again to ALL of you . . .

More Later . . .
 
Been watching along and becoming more and more amazed, as I see the amount of work, being done.
Thanks for taking us along!
 
Connecting the (2) shops together . . . is still the goal . . . and progressing . . .

Work continues . . .

The removal of the plywood sheathing from the side of the first part of the barn in progress . . .

sm_shop1576.jpg


And finally - there are no longer (2) shops as they are now all part of the shop . . . Got myself 1 shop now ! ! !

sm_shop1577.jpg


The design for the top of the silo is as follows - it contains full rafters, and half rafters . . . this should do the trick . . .

sm_shop1578.jpg


Got all of the full rafters cut and drilled . . . ready for wooden dowel pegs to help hold them together . . .

sm_shop1579.jpg


Working on the connection of the full rafters to the sections that will be holding them . . .

sm_shop1580.jpg


Got the bottoms all set - they are also dowelled to the center section . . . need to still do the same with the
top section . . . and "maybe" move a couple of them around to level things out a bit . . .

The "plan" is . . . this can be taken apart and hauled upstairs - and then re-assembled . . .

sm_shop1581.jpg


But for that to happen . . . I need the flooring on the top of the silo on place so that I can stand on it . . .

Work has begun on that part of the build . . . as you can see . . .

sm_shop1582.jpg


thought that the 20' 4 x 4 metal beam was going to need to be cut off . . . but it looks like I'll be adding an
additional 8 or so inches to the height to get it where it needs to be . . .

sm_shop1583.jpg


Now the center beam also becomes a integral part of the beam support for the silo floor . . .

sm_shop1584.jpg


Got all of the trusses in place . . . and got them painted to help protect the wood . . .

sm_shop1585.jpg


Things are still moving along, and the temps have finally started to fall a bit so that they are not so sweltering . . .
Boy was this a bad Summer with the heat and humidity . . .

Need to get this flooring down, and figure out a way to get from the current platform/staircase to the top level of
the silo . . . still got to figure out how to do that . . .

More Later . . .
 
Still working on getting a bunch of thing accomplished and wrapping up the exterior shell . . .

It's getting there . . . slowly but surely . . .

Getting some work done on the platform for the silo . . . so that the top walls and roof can be completed . . .
This is - by far - the biggest part of the build that still needs to be done . . .

sm_shop1586.jpg


Getting the decking in place . . . the gaps are big to allow the light to get through . . . it's planned that way . . .

sm_shop1587.jpg


Very hard to figure out HOW to get a good picture of this from the ground . . .

sm_shop1588.jpg


Then . . . while sitting on the decking up here and trying to figure out "how" to get the steps up here . . .
it finally came to me . . . just needed to change the direction of the steps . . . planning it out . . .

sm_shop1589.jpg


Oh, got a pretty sick tree . . . and it's with in falling on my house, the shop, and the carport . . . not good.
So I'm working on "limbing" this thing ( in my spare time ) so that it can come down . . . root ball and all ! !

sm_shop1590.jpg


Got the ladder to the top figured out, designed, and being built . . .

sm_shop1591.jpg


In the process of building this ladder, the expanded metal got stacked up and looked pretty cool . . .
Needed to get a picture of this and share it with everyone . . . too cool . . .

sm_shop1592.jpg


Once again - trying to get a picture of this area in the silo is not very easy - but the ladder in place . . .

sm_shop1593.jpg


One last piece of wall on the front of the shop ( actually it will be a door ) . . . and finally got it built . . .

sm_shop1595.jpg


And . . . of course . . . it HAD to get painted . . . and we now have a full front face of the shop ! ! !

sm_shop1597.jpg


First time that this has been seen - and it looks GREAT . . . More work left to do - and working on it !

More Later . . .
 
Still plugging along on the building . . . and making progress . . .

Sure is nice to have nicer temperatures, but the lack of daylight really sucks.

Finally got this part of the stairs completed and installed . . .

sm_shop1598.jpg


The next part of the puzzle is the windows above the doors on the back of the building . . .

sm_shop1599.jpg


Ordered the glass for the windows and got them built and delivered . . .

sm_shop1600.jpg


And finally . . . got them installed and the upstairs of the shop is now sealed up . . .

sm_shop1602.jpg


In addition to the pictures above . . . got up on roof of the shop and got the last section
of the ridge vent completed with the enclosures getting installed . . .

Working on getting the radiant barrier installed in the silo and the rest of the shop . . .

sm_shop1603.jpg


And another piece of the shop gets the radiant barrier also installed . . . got the back wall left to do still too . . .

sm_shop1604.jpg


Working on getting the inside of the shop all put together and get ready to have the insulation installed.

More Later . . .
 
Windows for the silo have arrived . . . Time to get started on finishing it up ! ! !

Finally - the windows for the silo are now sitting in my shop . . . ready to install . . .

First step of this process . . . is build the wall area so that the windows can be installed . . .
Here's the first step - the first part of the octagon wall going up . . . started on this in the morning . . .

sm_shop1605.jpg


Doesn't look like much for now . . . but it's onl6y the start of the project . . .

sm_shop1606.jpg


Lunchtime - and all but two of the walls are installed . . . moving along quite nicely ( for a change ) . . .

sm_shop1607.jpg


After all of the 8 wall were built - the next step was the roof . . . it was "assembled" in the shop . . .
NOW - time to take it apart and get it up on top of the silo . . . it was easier to do it this way . . .

sm_shop1608.jpg


Here's the first two sections of the silo roof - hauled up top - and put back together . . . went pretty well ! ! !

sm_shop1609.jpg


Once again . . . doesn't look like much . . . but it's the beginning of the final part of the silo ( and shop ) . . .

sm_shop1610.jpg


Next milestone . . . was getting 4 of the trusses in place and the roof supporting itself on the top of the silo . . .

sm_shop1611.jpg


Then - all 8 of them were re-built and in place on the top of the silo . . . it went faster than I expected . . .

sm_shop1612.jpg


From the ground - wish that I had got them painted . . . not real easy to see them in place up there . . .

sm_shop1613.jpg


Finally - that last part of the shop . . . the silo roof is starting to come together . . .

sm_shop1614.jpg


This part of the build actually went a lot faster than expected . . . did not ever expect to get this far today, and
was hoping to be able to post this tomorrow and have a majority of it in place . . . SURPRISE ! ! ! !

Next step - will be to get the 1/2 trusses in place up there . . . have them built - and had to do a slight mod on them,
but they're still off a bit on the fitment . . . figured they would just get "fitted" up there in place . . .

Sure hope that this decision is not one that will be regretted . . . ( sigh ) . . . will find out tomorrow . . .

More Later . . .
 